Handing over product documents at the end of a building project

5 min read · reviewed 16 November 2026

At the end of a building project the contractor assembles an operation and maintenance file, and asks every manufacturer for documents for the products that were installed.

The request usually comes late and in a hurry. A ready set per product saves your team days.

What is usually asked for

  • datasheets and declarations of performance for the installed products
  • certificates and test reports that were part of the specification
  • installation, maintenance and cleaning instructions
  • warranty terms
  • environmental declarations, where the project requires them

Give them the installed version

The set should match what was delivered, not the latest catalogue. A package built from the delivery date, with superseded versions included only where they applied, avoids dispute later.

Where it goes wrong

  • The contractor gets the newest datasheet for an older delivery.
  • Maintenance instructions are missing.
  • The package mixes markets and languages.
  • Nobody can show what was sent.

A checklist

  • Ask for the product list and delivery dates with the request.
  • Build the package from current documents that applied to that delivery and market.
  • Include maintenance and warranty documents.
  • Send it as a link with a record of what was opened.
  • Offer an updated link if a document changes later.

How to keep this under control

  • A package contains only documents that apply to the market and language, with a reason for each exclusion.
  • You can see what the contractor opened and downloaded.
  • When a newer version exists, you know who received the older one.

See packages for customer jobs

Questions people ask

What if the product has since been revised?
Send the documents that applied at delivery, and offer the new ones separately.
How long after handover might I be asked?
Questions can come years later, which is why versions and dates need to be kept.

General information, reviewed on 16 November 2026. It is not legal advice, and the rules change: check the current regulation and your harmonised standards, or ask your notified body, before you rely on it.

Related guides

All guides ›

Try Collatral free for 14 days.

  • No credit card required, nothing to install
  • Your own documents, your colleagues, a real customer package
  • If you do not continue, the workspace is read-only for 30 days, then everything is deleted
Start your free trial